SPRING KICKOFF 4/20/2024

I set up the rides for the Spring Kickoff from Brookside.  Last time we held Spring Kickoff at Brookside was 4/16/2016 and looking forward to a great meeting and rides.  If you want to lead one of the rides, please contact me.  If you have an idea for a different ride, please let me know.  Tentative start time for the rides is 11 am and could be later or sooner depending on when meeting ends and cleanup is complete.

Manny

RIDE COORDINATOR UPDATES

WOODFERN BRIDGE-Bridge is “officially” closed.  During a recent storm a tree fell on the bridge causing damage to the upper supports.  Tree has been removed.  Easy detour is Woodfern to Amwell to Blackpoint.  You can probably cross the bridge if no construction workers are present but that is your decision.

NESHANIC STATION-When you cross the White Bridge from Neshanic Station you can’t make a left onto River Road to get to Opie Road due to construction.  Recommend making a right and then a quick left onto Mill Ln to get to Opie/River Rd.  I happen to like Mill Ln better than Opie.

OTTO BURGER-Bad news is Brick Farm Market in Hopewell has closed and moved a short distance down the road and has significantly downsized with less to offer.   Good news is Otto Burger has moved into the vacated spot and I have been told that they have pastries, coffee, etc to offer.  I will be checking it out soon.

RIDE LEADER-If anyone is interested in helping MAFW and becoming a ride leader please contact me.

Manny

BROOKSIDE COMMUNITY CENTER

We are looking to reserve the Brookside Community Center in Mendham for our Spring kickoff meeting.  Are any of you members of Brookside or know someone who is a member?

Thanks, Manny

Road Closures

North Branch River Rd – This section of road between RT202 and Old York Rd has been closed while a new bridge is being built.  Looks like bridge work is complete and I hope road will be open soon.

Woodfern Bridge – The tree that fell on the bridge was removed and the upper works of the bridge did sustain some damage but the road bed seems OK.  The bridge is still closed.

Layton Rd – Layton Rd from Liberty Corner Rd to Douglas Rd is closed due to road repairs but Douglas Rd is now fully open. To get around closure of Layton just use Douglas.

Manny

PLATTEKILL SKI TRIP

Watchung Amateur Ski Club is running a bus trip to Plattekill this Sunday and has a few openings.  Cost of trip for nonmembers is $135 and includes bus transportation, breakfast, apres-ski snacks and lift ticket.  Rentals can be arranged and trip open to families. Bus leaves from Hyatt Golf Course in Clark at 6am. Alternate pickup in Mahwah on RT17. At least 6 members of WASC are also members of MAFW and during the year we run joint cycling trips.  If interested, you can contact me at mannyt66@gmail.com or call me at 732-259-8990.  See below for more info.

Thanks, Manny

Experience an “old school” skiing experience at Plattekill!

February 25, 2024

HOP ON THE BUS; LEAVE THE DRIVING TO US!

Located in the Northwestern Catskills of New York, Plattekill Mountain is the last family-owned and operated mountain in the region, a variety that is becoming few and far between in today’s changed skiing industry. Their motto – FIERCELY INDEPENDENT – describes them best, not owned by a corporation or group of mountains, but by a family. That’s what makes a visit to Plattekill unique: a good old-fashioned family atmosphere with a laid-back, authentic, “independent” vibe feeling. BIG mountain terrain and SMALL mountain charm. Choose from 40 trails, cruise down Plattekill’s 2-mile long beginner run, and charge down the steep double black diamonds with 1100′ of vertical drop. There truly is something for everyone.

BUS INFORMATION

Click here to download bus pick-up times, locations & other information

INCLUDED IN THE TRIP

• Round-trip bus transportation
• Breakfast on the bus***
• Après ski snacks on the return trip
• All-day lift ticket

Woodfern Bridge Closed

During this recent storm a tree fell on the Woodfern Bridge as you can see in the attached picture.  The bridge will be out of action for several months and don’t plan on crossing the bridge while being repaired.  One easy detour is make a right turn onto Woodfern Rd from Three Bridges Rd, left on Amwell, left onto Blackpoint after very short distance, and then right onto Woodfern.  Woodfern from bridge to Amwell is a little bumpy but you are on Woodfern only ~1/2 mile and it is level and paved.  If coming from Wawa take Summer Rd to Briar Way to Lehigh.  I will leave it up to you to determine best detour for your ride.  Today the Blackpoint bridge was OK but road from the bridge to Woodfern was a little flooded but should be OK tomorrow.  Duke Island Park is closed due to flooding but should be open soon.  Time for John Storey to schedule a kayak trip but just duck when going under the bridges.

https://patch.com/new-jersey/bridgewater/branchburg-bridge-closed-several-months-after-storm-damage

SPECIAL RIDES CALENDAR

In addition to the rides on our schedule we have special rides listed on our calendar and there will be more posted.  Recommend you check out these rides.  Several of us have registered again for the Bon Ton Roulet, a multiday ride in the Finger Lakes of New York.  About 8 MAFW riders did it last year and had a great time.  If you have any questions about Bon Ton feel free to contact me.

Manny